Godawari Green Energy

General Info
Owner/s: 
Hira group
Technology: 
Parabolic trough
Country: 
India
Status: 
Operational
Purpose: 
Commercial
Usage: 
Electricity
Power: 
50.00 MW
Construction start date: 
November 2011
Start date: 
June, 2013
Location: 
Nokh Village, Pokaran Tehsil, Jaisalmer District, Rajasthan State
Generation: 
118.00 GWh
Land area: 
150 hectares
Technology

Solar field

Solar Collector Assemblies - Trough: 
EuroTrough ET-150
Mirrors / Reflective surface: 
Flabeg RP3
Number of SCAs: 
480
Number of loops: 
120
Number of SCAs per loop: 
4
Number of modules per SCA: 
12
SCA aperture area: 
817 m²
SCA length: 
144 m
Reflecting area: 
394 000 m²
Heat Collector Element (Tube): 
Schott PTR70
Heat Transfer Fluid: 
Dowtherm A
HTF Temp in: 
293ºC
HTF Temp out: 
390ºC

Power block

Storage Y/N: 
No
Power cycle: 
Steam Rankine
Turbine: 
Siemens SST700
Cooling: 
Wet
Power (gross): 
50.00 MW
Companies involved
Project developer: 
Godawari Green Energy
EPC: 
Lauren Engineering
O&M: 
Godawari Green Energy
Key components suppliers: 
Siemens
Aalborg CSP
Dow Chemical
Flabeg
Suppliers details: 
Aalborg CSP (steam generation)
Siemens (turbine)
Schlaich Bergermann und Partner (design, detailed engineering, tender documents, manufacturing supervision, assembly supervision)l)
Paharpur (cooling tower)
Sulzer India (boiler feed pump, HTF pumps)
Schott (Heat Transfer Elements)
Flabeg (mirrors)
Ravi Industries (HTF vessel, espansion tanks, deaerator)
Flexim (Flowmeter for HTF and/or Molten Salt)
Dow Chemicals (HTF)
Socioeconomics
Generation Offtaker: 
NTPC Vidyut Vyapar Nigam
PPA/Tariff: 
12.2 Rs per kWh - 25 years
Other financing info: 

The project is to be registered in the Clean Development Mechanism of the UNFCCC to earn Certified Emission Reduction (CER) credits.

General comments:
Documents and links:
Godawari Green Energy CSP plant - Photo:SBP
Videos: